RFQ & Quote Tools
Supplier Enquiry Checklist
You can start a supplier conversation without knowing every technical detail. Tell the supplier what you want to sell and roughly how many, then tighten the specification when comparing quotations and approving production.
What do you need to tell the supplier now?
An early enquiry can be short. As you find a suitable model, confirm which details are agreed, which are supplier proposals and which still need answers before paying or approving production.
Mark what is confirmed and what is still open
| Status | Meaning |
|---|---|
| Must confirm | Required before the stage can be completed. |
| Target | The buyer has a preferred value but may review a supported alternative. |
| Open | The point is not decided yet and must remain visible. |
| Supplier proposal permitted | The supplier may propose an option and explain its effect on price, MOQ, timing or performance. |
A. Product enquiry
Goal: Confirm whether the supplier can discuss the intended product, market, quantity range and level of customisation.
Fields for this stage
- Product identity and intended use
- Target country or market
- Reference image, model or link, clearly labelled as a reference
- Required materials, dimensions or performance where already known
- Expected quantity range and number of SKUs, colours or sizes
- Stock, private-label, ODM or OEM scope
- Packaging and branding direction
- Sample requirement and delivery country
- Open points the supplier may propose
Do not require too early: Do not demand a final production specification, final compliance file or fixed delivery date before the product version and project scope are understood.
B. Comparable quotation request
Goal: Give every supplier the same quotation basis so differences in product, quantity, packaging, costs and terms remain visible.
Fields for this stage
- Specification or requirement version
- Materials, dimensions and performance fields
- Quantity tiers and permitted variant mix
- MOQ basis: total order, SKU, colour, size and packaging component
- Unit price and included or excluded items
- Packaging and labelling scope
- Known compliance or document requirements
- Sample cost and sample lead time
- Tooling, setup, testing and packaging charges
- Incoterm and named place
- Production lead-time starting event
- Payment terms and quotation validity
Do not require too early: Do not ask for one unexplained “best price,” combine different Incoterms in one comparison, or leave suppliers to choose different product assumptions without marking them.
C. Pre-production confirmation
Goal: Freeze the version that will be produced and connect approvals, documents, commercial terms and change control to that version.
Fields for this stage
- Final product identity and approved specification revision
- Approved sample or reference sample identifier
- Materials, dimensions, performance and tolerances
- Approved artwork, packaging, labels and manuals
- Final quantities and variant breakdown
- Compliance responsibilities and order-relevant documents
- Production site and responsible legal entities
- Final price, charges, Incoterm and payment milestones
- Production lead-time starting event and shipment-ready definition
- Inspection, change approval and discrepancy process
Do not require too early: Do not treat an earlier quotation, chat approval or unnumbered attachment as the final production instruction. Do not allow an open critical field to become accepted by silence.
Keep sample, drawing and artwork versions clear
Give each file a stable identity so the supplier can state which version was quoted and which version controls production.
| File name | Version | Revision date | Purpose | Reference sample | Precedence if records differ |
|---|---|---|---|---|---|
| Product-specification | V1.0 | YYYY-MM-DD | Quotation basis | Sample ID, if any | State whether the approved drawing, specification or reference sample controls each field |
Ask every supplier to use the same reply structure
| Field | Supplier response | Included in price? | MOQ basis | Lead-time effect | Evidence or attachment | Open point |
|---|---|---|---|---|---|---|
| Quoted product and version | ||||||
| Materials, dimensions and performance | ||||||
| Packaging, compliance, sample and commercial terms |
A supplier may answer “cannot confirm,” “need to check” or propose an alternative. That is more useful than an assumed answer because it keeps the comparison basis visible.
Electrical-product example: Air Fryer
Voltage, frequency, plug type and rated power are relevant to electrical products, not universal RFQ fields. For an air fryer enquiry, add those fields together with capacity basis, basket format, control type and required destination-market version. Use the Air Fryer RFQ Checklist for the product-specific structure.
What to settle before ordering
- Do not leave MOQ as one number: confirm whether it applies to the total order, each SKU, colour, size or packaging component.
- Do not compare quotations until the quoted product version, quantity basis, Incoterm and main exclusions are visible.
- Pause pre-production approval if the controlling specification, approved sample, packaging revision or critical compliance responsibility is still open.
Related next steps
- What to Check Before Accepting a Supplier MOQ
- How to Ask About Lead Time from Chinese Suppliers
- How to Identify the Legal Entity Behind a Chinese Supplier Website
- Quote Comparison Template
- Supplier Reply and Open-Question Tracker
- Start Here for Buyers
If you have an actual quotation or supplier document that still does not make sense, see how we can help review your case.